Waste time...
From mbs side... Was der on Sat morning...
Take about 20mins to reach the Q... Coz of traffic congestion...
Another 10 mins in Q...
Might as well pick at mbs..
you wnet there late la...5,000 pepole all want to take taxi, crowd only cleared at 12pm...cppl tell me the congestion due to the ship...
Originally posted by Khoon 24:Waste time...
From mbs side... Was der on Sat morning...
Take about 20mins to reach the Q... Coz of traffic congestion...
Another 10 mins in Q...
Might as well pick at mbs..
ytd 10am havent start engine....
control already measage cruise center can try..
knn siao si bo, 10am hdb ping ping piang piang...
where got time to go their...
big daddy, can suggest u open limo counter like airport, tenah merah and vivo.
blackie also can... then u can claim credit for solving the taxi issue.
no need to post here post there their arrival timing anymore. maybe pte limo also?
Originally posted by Khoon 24:Waste time...
From mbs side... Was der on Sat morning...
Take about 20mins to reach the Q... Coz of traffic congestion...
Another 10 mins in Q...
Might as well pick at mbs..
All these issues will be solved when the marina south pier mrt starts operating ...
![]() NS28 Marina South Pier MRT Station 滨海å�—ç �头地é“�ç«™ Rapid transit |
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Station statistics | |||||||||||
Address | 33 Marina Coastal Drive Singapore 018948 |
||||||||||
Coordinates | 1°16′15.45″N 103°51′47.67″E | ||||||||||
Lines | (Under Construction) | ||||||||||
Connections | Bus, Taxi | ||||||||||
Structure | Underground | ||||||||||
Levels | 2 | ||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Other information | |||||||||||
Opened | 2014 | ||||||||||
Accessible | ![]() |
||||||||||
Code | NS28 | ||||||||||
Operator | SMRT Trains (SMRT Corporation) | ||||||||||
Services | |||||||||||
|
|||||||||||
Location | |||||||||||
Marina South Pier MRT Station (NS28) is the future southern terminal station of the North South Line in Singapore. This station is located on reclaimed land and is built as part of the North South Line Extension (NSLe) when it is scheduled to open in 2014.
The station is located near the Marina South Pier and the Marina Bay Cruise Centre Singapore. An extension to Marina Barrage was previously planned but plans for that were shelved.
The station's working name Marina Pier MRT Station was not revealed until the Land Transport Authority updated the rail map which includes future MRT lines on May 3, 2010, not long after the opening of the Circle Line Stages 1 & 2.[1] A second tentative name of Marina South Pier MRT Station was released when the map was updated on Sep 19 2011.
A $357.5 million contract was awarded to Samsung C&T Corporation for the civil works of the extension. Construction works for the station started in December 2009.