Notes: You indeed released a route BUT one thing for sure is that u need to have WB object first.
Originally posted by Samuel Lee:Notes: You indeed released a route BUT one thing for sure is that u need to have WB object first.
Send me again. The file failed to send to me :P
Originally posted by Dragonaxe:Send me again. The file failed to send to me :P
My MSN got some problem.
Originally posted by Samuel Lee:My MSN got some problem.
Upload to megaupload or mediafire then send me the link.
Originally posted by Dragonaxe:Upload to megaupload or mediafire then send me the link.
I hate such services. MEgaupload too troublesome while I dont have account for either. Skydrive.... Nah. (I dun wan update everybody on the status)
Bumpz? Progress halted until 11 Oct 2010.
Bump!
I could have locked this thread, but well, ytd Dragonaxe send me a route from KAL - KEM that is based on existing WB objects. Well, I could say is some fine tuning (Especially many changes on EWL WB) is still required as I know the workaround is a method that is known by me only.
So this all I can say. The next EWL release may just feature PSR - TIB, JKN - KEM (Merging from JKN - RDH and this KAL - KEM along with my own extension from RDH - KAL because I know the engineering feat involved)
Originally posted by C751A 70049/70050:I could have locked this thread, but well, ytd Dragonaxe send me a route from KAL - KEM that is based on existing WB objects. Well, I could say is some fine tuning (Especially many changes on EWL WB) is still required as I know the workaround is a method that is known by me only.
So this all I can say. The next EWL release may just feature PSR - TIB, JKN - KEM (Merging from JKN - RDH and this KAL - KEM along with my own extension from RDH - KAL because I know the engineering feat involved)
I have optimized the sector that Dragonaxe has made and for now, I just reverse the code used in PSR - TIB on BDK - KEM sector in order to extend his line to Bedok. That would be my day for EWL.
Originally posted by C751A 70049/70050:I have optimized the sector that Dragonaxe has made and for now, I just reverse the code used in PSR - TIB on BDK - KEM sector in order to extend his line to Bedok. That would be my day for EWL.
Forget it, I ask Dragonaxe to extend the optimized route to TNM instead. Reversing code is tedious and confused and self-pwned.
Well, I am in quite bad mood now, because I take almost 2 days and still have not finish the route between Tanah Merah to Simei. Eh can support EWL or not? How come like nobody is even bother to take a peek on EWL one leh.
Originally posted by C751A 70049/70050:Well, I am in quite bad mood now, because I take almost 2 days and still have not finish the route between Tanah Merah to Simei. Eh can support EWL or not? How come like nobody is even bother to take a peek on EWL one leh.
Because nobody noticed there's a EB EWL Thread. Good Luck on the project. What about DragonAxe?
Originally posted by Bngauw:
Because nobody noticed there's a EB EWL Thread. Good Luck on the project. What about DragonAxe?
I'm lazy to bump it and upload updates lol
Bump: Summary of updates
We have move to:
http://forums.sgtrains.com/showthread.php?tid=61&pid=255#pid255